Arabian construction company qatar.
BEMCO was formed in 1968 and has developed into a world-class EPC Turnkey Contractor in Industrial and Power Projects including Co-generation, Combined Cycle and Steam Power Plants. Under this expansion, BEMCO has undertaken the largest and most challenging turnkey projects in Saudi Arabia and the region using various
state of the art technologies. BEMCO’s capabilities comprise full-scale and integrated capabilities in Engineering, Procurement, Construction, Fabrication, and Start-up & Commissioning. Bemco has a big fleet of Construction equipments and a workforce totaling 18,000 employees more. Download Center.
June 2014 - Issue # 4 Download Corporate Brochure Download June 2013 - Issue # 4 Download May 2012 - Issue # 3 Download April 2011 - Issue # 2 Download Nov 2010 - Issue # 1 Download. Major Projects. Riyadh Power Plant No.9 Combined Cycle (5,980 MW) The combined cycle plant (PP9) has been built on a site of 3.2 million square meter about 54km east of Riyadh. This construction, together with an expansion of the existing PP 9 facility, made Riyadh the largest crude oil-fired power plant in the world. Arabian Bemco Contracting Company was awarded the project by SEC.
Works Started in 1995, Riyadh Power Plant No.10 Combined Cyle (4,600 MW) On June 30, 2008 Arabian Bemco was awarded a S.R 11 billion (USD 3 billion) contract with SEC for a turnkey supply and installationof a 2,600 MW power geneartion plant (PP10) built on an area of 5 million square meter outside the capital of Saudi Arabia, Riyadh.This is a Greenfield project
that will initially install 36 GTG simple cycle base loaded gas turbines on. Qurayyah Combined Cycle Project (4,600 MW) On June 11, 2007, Arabian Bemco was awarded a SR 2.1 billion (USD 570 Million) contract with SEC to build the 2,500 MW Qurrayah Open Cycle Power Plant in the Eastern Province of KSA. Under the engineering, civil construction and mechanical erection package, Arabian Bemco will install gas-fired turbines at the plant supplied by. Riyadh Power Plant No.12 Combined Cycle (2,175 MW) On May 16, 2012, Arabian Bemco signed a S.R 4.7 billion contract (USD 1.3 billion) with the Saudi Electricity Company to build a Grass Root Combined Cycle Power Plant in Riyadh, Saudi Arabia. The plant is located 100 KM West of Riyadh City. Once completed, the new grass root combined cycle power plant (PP12) will produce.